| The project pyramid : 5 constraints |
|
|
|
From The Rational Edge: Joe Marasco proposes a model for predicting project success based on a familiar geometrical shape. Probability of success is measured by a pyramid's altitude, and four production factors -- scope, quality, speed, and frugality (or limits on resources) -- form the four sides of the base.
http://www.ibm.com/developerworks/rational/library/4291.html |
| Next > |
|---|